From design to delivery, you can follow every step of your order. Stay informed, stay confident — we keep everything transparent.
Track Your Custom Orders
Enter your order ID or email address to check the status
Fetching Your Orders from CreatePins Order System…
Enamel Pin Production Workflow
Typical lead time shown — final schedule depends on order size & options
1
Artwork & Digital Proof
Final vector; confirm size, Pantone, plating & backing
1-2 days
2
Die / Mold Making
CNC tool made to the approved proof
1-3 days
3
Stamping & Cutting
Stamp blanks, then cut to shape
1-2 days
4
Polishing & Plating
Polish raised areas; electroplate to chosen finish
3-6 days
5
Enamel Filling
Color fills and layer-by-layer cure (soft/hard)
2-5 days
6
Finishing & QC
Cure, epoxy coat, attachments, and final inspection
2-4 days
Detailed Production Stages
| Production Stage | Factory‑tone Explanation (for clients) | Timeline |
|---|---|---|
1. Artwork & Digital Proof Final vector; confirm size, Pantone, plating & backing. |
We convert your artwork into production-ready vector files and issue a concise proof. All critical parameters (exact size, Pantone matches, metal finish, and backing) are locked at this point. Revisions after tooling incur additional tooling time and cost. | 1–2 days |
2. Die / Mold Making CNC tool made to the approved proof. |
We produce the CNC die that defines raised and recessed areas. Dies are precision‑checked and stored for reorders. Tooling is a one-time setup cost and is only released once you approve the final mock. | 1–3 days |
3. Die Striking / Stamping & Cutting Stamp blanks, then cut to shape. |
Metal sheets are stamped with the die and trimmed to profile. We maintain tight tolerances to ensure consistent edge finish and alignment for subsequent plating and enamel work. | 1–2 days |
4. Surface Preparation & Polishing Polish raised areas; prep for plating. |
Parts are tumbled and hand-polished where required to remove burs and prepare the surface for plating. This step prevents plating defects and improves final luster. | 1–2 days |
5. Plating Electroplating to chosen finish. |
We plate with the selected finish (gold, silver, black nickel, antique, etc.). Plating baths are monitored for thickness and color consistency; multiple passes may be used for specialty finishes. | 2–4 days |
6. Enamel Filling (Soft or Hard) Color fills and layer‑by‑layer cure. |
Enamel is manually or semi-automatically dispensed into recessed areas. For multi-color artwork we sequence fills to avoid contamination. Hard enamel requires additional grinding and polishing to achieve a flush surface. | 2–5 days |
7. Baking / Curing & Coating Stabilize enamel; optional epoxy coat. |
Enamel is heat-cured to harden; optional epoxy or protective coatings are applied for additional durability. Each coating is inspected for bubbles and visual defects. | 1–2 days |
8. Attachment Fittings Solder or press on clutches, pins. |
Backings (butterfly clutch, rubber clutch, magnets, etc.) are installed and secured. We verify centering and rotational alignment so pins sit correctly on garments. | 0.5–1 day |
9. Quality Control Inspection: color, plating, fit, finish. |
Each batch passes a 3-point inspection: visual color match vs proof, plating uniformity, and mechanical attachment strength. Defective units are reworked or rejected per agreed tolerance levels. | 0.5–1 days |
10. Packaging & Dispatch Pack per spec; prepare shipping docs. |
Final packaging (polybag, backing card, boxes) and labeling are applied. We generate packing lists and handle export documentation if required. Orders are staged for shipment with carrier labeling. | 0.5–2 days |